 |
|
Terms & Conditions
- Nonconformance Notification -Supplier shall notify Planet Tool & Engineering of nonconforming product and make arrangements for Planet Tool & Engineering's approval of supplier nonconforming material.
- Change Notification -Planet Tool & Engineering requires the supplier to notify Planet Tool & Engineering of changes in product and/or process definition and, where required, obtain organization approval.
- Right of Access -Right of access by Planet Tool & Engineering, our customer, and regulatory authorities to all facilities involved in the order and to all applicable records
- Sub-tier Supplier Flowdown -Planet Tool & Engineering requires the supplier to flow to sub-tier suppliers the applicable requirements in the purchasing documents, including key characteristics where required.
- Digital Product Definition (DPD) -Supplier is required to obtain approval as a DPD-capable supplier if the supplier receives download, and/or uses Computer Aided Design geometry in any format from Planet Tool & Engineering requiring DPD quality assurance. Digital datasets are reference only (not design or inspection authority) until DPD approval status is obtained. A copy of Boeing Document D6-51991 can be found at the following URL: http://www.boeingsuppliers.com/supplier
- ITAR -Supplier shall only assign personnel to perform work in supplier's facilities who are either U.S citizens or who have been granted permanent resident alien status in the U.S.
- Record Retention -Supplier shall retain records for 7 years or per contract requirement
|
|